- Public Awareness Enforcement Guidance
- Missouri State Regulation Changes
- Georgia State Regulation Changes
- PHMSA Public Awareness Workshop
- PHMSA Workshop on Integrity Verification Process
- PHMSA Emergency Response Guidebook App
- Pipeline Regulations for iPhone
- AGA Award of Merit
- Summer Conference Schedule
- Ongoing Resources
- Regulatory Watch: Key Dates & Deadlines
- Conference News
- PSI Training Schedule
Public Awareness Enforcement Guidance
The Department of Transportation/Pipeline Hazardous Materials Safety Administration (PHMSA) posted their enforcement guidance documents for Public Awareness for both Part 192 and Part 195 (revised 4/30/2013). The materials contained in these documents consist of guidance, techniques, procedures and other information for internal use by the PHMSA pipeline safety enforcement staff. These guidance documents describe the practices used by PHMSA pipeline safety investigators and other enforcement personnel in undertaking their compliance, inspection, and enforcement activities.
For a copy of the Public Awareness Enforcement Guidance contact Jessica Roger . (Please specify Part 192, Part 195 or both.)
Public Awareness
Do you have a Public Awareness effectiveness evaluation inspection coming up? Need a Public Awareness Plan? RCP has developed 100’s of plans and participated in dozens of inspections. Contact Jessica Roger for help with your Public Awareness Program.
Missouri State Regulation Changes
On May 15, 2013 the Missouri Public Service Commission updated their gas pipeline regulations found in the Code of State Regulations (CSR) Title 4 Division 240 Chapter 40 Gas Utilities and Gas Safety Standards. In addition to editorial changes, the following more significant changes were made:
4 CSR 240-40.020 Incident, Annual and Safety-Related Condition Reporting
- Exempted pipelines that operate at less than 0 psi and pipelines that are not a regulated onshore gathering line (as determined in 4 CSR 240-40-030(1)(E)).
- Updated the definition of an incident to exclude the cost of gas from the $50,000 reporting threshold and add a three million cubic feet threshold for reporting unintentional estimated gas loss.
- Rather than requiring a telephonic report, an immediate notification must be made to the National Response Center by either telephone or electronically at NRC.USCG.MIL
- Updated PHMSA reporting requirements to match the report submission requirements found in 49 CFR 191.
- Require a federal incident report be filed within 30 days after detection of an incident on the incident form revised June 2011.
- Added requirements for Mechanical Fitting Failure Reports to the requirements for filing distribution system annual reports.
- Added requirements for obtaining OPID and reporting changes.
4 CSR 240-40.030 Safety Standards – Transportation of Gas by Pipeline.
- Added definitions for active corrosion, electrical survey, PHMSA, Pipeline Environment, and Service line serving single-family residence.
- Added control room management procedures and distribution integrity management plans as procedures and plans that must be submitted to the designated commission personnel.
- Updated the requirements, to match those in the Federal Regulations, for transporting pipe.
- Specifically states 49 CFR 192.123(e) and (f) are not incorporated due to the fact that they permit higher design pressures for certain types of thermoplastic pipe.
- Forbids valves having a shell body made of cast iron, malleable iron or ductile iron from being used in gas pipe components of compressor stations.
- Added requirements for installation of excess flow valves in any new or replaced service line serving a single-family residence after February 12, 2010 unless stated exemptions are met.
- Added requirements for the Operations and Maintenance Manual to include procedures for implementing the applicable control room management procedures required.
- Added requirements for adding actions required to be taken by a controller during an emergency in accordance with control room management requirements.
- Provides requirements for master meter operators to develop and implement procedures to provide customers public awareness messages twice annually in lieu of a full public awareness program.
- Added Control Room Management requirements.
- Updated requirements for permanent repairs for non-integrity and integrity management repairs.
- Updates to the pipeline integrity management for transmission lines.
- Added requirements for gas distribution integrity management.
For a copy of the Missouri updated regulations, contact Jessica Roger
Georgia State Regulation Changes
515-9-1-.06 Incident Requiring Telephonic Notification
The Georgia Public Service Commission updated their gas pipeline regulations found in Section 515 Chapter 9 Rule 1 Safe Installation and Operation of Natural Gas Transmission Pipelines. This update defines a pipeline incident to be the same as that defined in 49 CFR 191.3. Operators are required to provide a telephonic notice to the Commission’s Pipeline Safety Staff for incidents and a written report within 30 days of the incident describing the relevant facts regarding the incident as well as information on any investigation conducted by the operator. These updates are effective May 2, 2013.
For a copy of these updated regulations, contact Jessica Roger
PHMSA Public Awareness Workshop
June 19-20, 2013 Dallas, Texas
The Department of Transportation/Pipeline Hazardous Materials Safety Administration (PHMSA) will conduct a two-day workshop to bring together pipeline safety public awareness stakeholders to discuss findings from recent federal and state public awareness inspections, and gain perspectives from various stakeholders on public awareness challenges and successes to identify ways to strengthen pipeline safety public awareness. Presentations from this workshop will be made available following the workshop.
Registration and hotel information can be found on the PHMSA website.
PHMSA Workshop on Integrity Verification Process
The Department of Transportation/Pipeline Hazardous Materials Safety Administration (PHMSA) is conducting a public workshop on the concept of “Integrity Verification Process.” The Integrity Verification Process shares similar characteristics with fitness for service processes. At this workshop, PHMSA, the National Association of State Pipeline Safety Representatives and various other stakeholders will present information and seek comment on a proposed Integrity Verification Process that will help address several mandates set forth in Section 23, Maximum Allowable Operating Pressure, of the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011.
The public meeting will be held on Wednesday, August 7, 2013 in the DC area (exact location TBD). This workshop will be webcast, and presentations will be available online at http://www.phmsa.dot.gov/ after the conclusion of the meeting.
Members of the public may attend this free workshop. To help assure that adequate space is provided, all attendees are encouraged to register for the workshop in advance. More details on this meeting, including the location, times, and agenda items, will be available on the meeting registration website.
Members of the public may also submit written comments either before or after the workshop. Written comments must be received by September 9, 2013. Comments should reference Docket No. PHMSA-2013-0119 and can be submitted via the E-Gov Website.
For more information, contact Cameron Satterthwaite, Office of Pipeline Safety, at 202-366-1319 or by email.
PHMSA Emergency Response Guidebook App
PHMSA has created an app for their Emergency Response Guidebook 2012 (ERG), which can be downloaded from iTunes or Google Plan. Visit PHMSA for more information to download the 2012 ERG Mobile App. The ERG is widely used by emergency responders to quickly locate information about hazardous materials. The 2012 edition includes new evacuation tables for large toxic gas spills, and standard response procedures for gas and liquid pipeline incidents. PHMSA’s website also contains an instructional video at http://www.phmsa.dot.gov/hazmat/library/erg.
Pipeline Regulations for iPhone
There’s an app for that! In 2009, at our request, Tekk Innovations developed an iPhone application containing the federal pipeline safety regulations (49 CFR 40, and 190-199). It has keyword search and the capability to e-mail excerpts of the regulations to others. There have been several updates since the original app was released. The current version 1.9 was updated on February 27, 2013. The app can be found in the iTunes store. The cost is $19.99.
Tekk Innovations has also developed apps for all the other CFRs, including all of 49 CFR for those who want all the transportation regulations, not just the pipeline ones; Louisiana Law, California Law and FAA FAR for Pilots.
Editor’s Note: I like the app with just the pipeline parts of 49 CFR, since I can search the pipeline regulations easier that way without getting hits from the other transportation regulations.
AGA Award of Merit
RCP is excited to announce that Chris Foley (RCP’s Vice President) received the Bronze Award of Merit from AGA. The award was presented at the recent 2013 AGA Operations Conference & Biennial Exhibition in Orlando, Florida. He received this award based on his active and continuous service to the AGA Operating Section through participation on technical committee(s), as well as his participation in AGA events either as an attendee or speaker. The AGA Operating Section strives to aid member companies in operating safely, efficiently, and reliably while continuing to serve the best interests of customers and the general public. Please join us in congratulating Chris on this prestigious award.
Summer Conference Schedule
Have you registered and confirmed your reservations for these upcoming conferences? RCP will have representatives and Exhibits at these upcoming conferences. Click on the links below for registration and hotel information. We hope to see you there!
Texas Gas Association (TGA) Operations & Management Conference
June 23 – 26 (Ft. Worth, TX)
Louisiana Gas Association (LGA) Pipeline Safety Conference
July 22 – 26 (New Orleans, LA)
Southern Gas Association (SGA) Operating Conference & Exhibits
July 22 – 24 (Houston, TX)
Western Regional Gas Conference (WRGC)
August 21 – 21 (Tempe, AZ)
NACE Central Area Conference
August 26 – 28 (Little Rock, AR)
Ongoing Resources
These articles are maintained and updated as new information becomes available.
Regulatory Watch: Key Dates & Deadlines
Welcome to Regulatory Watch! In this monthly update, we’ll keep you informed on proposed rule comment periods, effective dates, and upcoming deadlines for various compliance requirements.
Administrative Rulemaking Regulatory Procedures
All Liquid HCA segments capable of ILI § 195.452(n)
Amendments to Liquefied Natural Gas Facilities
Breakout Tank
Coastal Ecological Unusually Sensitive Areas
Cost Recovery for Siting Reviews for LNG Facilities
Gas Pipeline Leak Detection and Repair
Gas Transmission: Assessments Outside HCAs § 192.710
Oil Spill Response Plans, Accident Notifications, Inspections and Investigations and other Miscellaneous Pipeline Safety Changes
Pipeline Operational Status
Repair Criteria for Gas and Hazardous Liquid Pipelines
Safety of Carbon Dioxide and Hazardous Liquid Pipelines
Safety of Gas Distribution Pipelines and Other Pipeline Safety Initiatives
Sprint I & II Update
To further the Administration’s deregulatory policies, PHMSA has published in today’s Federal Register twenty-eight (28) separate rulemaking actions affecting the pipeline safety regulations (PSR; Parts 190-199). Click here to access the documents.
| Rulemaking | Description | Stage | Code |
|---|---|---|---|
| Pipeline Safety: Rationalize Special Permit Conditions | PHMSA proposes to amend its special permit procedures to ensure permit conditions are directly tied to the specific pipeline safety regulations being waived. | NPRM | 49 CFR Part 190 |
| Pipeline Safety: Rationalize Calculation of Regulatory Filing and Compliance Deadlines | PHMSA will clarify that regulatory filing and compliance deadlines falling on weekends or Federal holidays automatically move to the next business day. | DFR | 49 CFR Part 190 |
| Pipeline Safety: Adjust Annual Report Filing Timelines | PHMSA will amend annual reporting requirements to move the gas pipeline annual report submission deadline from March to June. | DFR | 49 CFR Part 191 |
| Pipeline Safety: Property Damage Definition for Incident Reporting | PHMSA will clarify incident reporting property damage calculations for gas pipelines and update hazardous liquid accident reporting thresholds using inflation-adjusted criteria. | DFR | 49 CFR Parts 191 & 195 |
| Pipeline Safety: Exception for In-Plant Piping Systems | PHMSA proposes to clarify that in-plant piping systems are not subject to federal pipeline safety regulations. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Codify Enforcement Discretion on Incidental Gathering Lines | PHMSA proposes to codify enforcement discretion clarifying that restrictions on the historical incidental gathering line exemption apply only to newly constructed lines. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Eliminate Burdensome Coating Assessment Deadlines | PHMSA proposes to replace prescriptive deadlines for coating damage assessments and remediation with a requirement that activities be completed before the pipeline is placed in service. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Atmospheric Corrosion Reassessment for Pipeline Replacements | PHMSA proposes to remove the 3-year reassessment interval following replacement of atmospheric corrosion defects and allow use of the standard 5-year reassessment interval. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Harmonize Class Change Pressure Test Requirements | PHMSA proposes to reduce the minimum pressure test duration following certain class location changes from 8 hours to 4 hours, aligning with existing Subpart J requirements. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Clarify MAOP Reconfirmation Testing Records | PHMSA will issue a technical correction clarifying that operators may use pre-1970s pressure test records when reconfirming MAOP under §192.624. | Final Rule | 49 CFR Part 192 |
| Pipeline Safety: Remote Sensing Technologies for ROW Patrols | PHMSA will explicitly allow right-of-way patrols to be conducted using unmanned aircraft systems, satellites, and other remote sensing technologies. | DFR | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Technical Standards Updates and Amendments | PHMSA will update incorporated standards and make technical amendments in response to an industry petition for reconsideration. | Final Rule | 49 CFR Part 192 |
| Pipeline Safety Program: Update of Standards Incorporated by Reference | PHMSA issued multiple direct final rules updating incorporated industry consensus standards used throughout Parts 192 and 195, replacing outdated editions with current versions. | Multiple DFRs | 49 CFR Parts 192 & 195 |
The following is a summary of the 40 rulemakings that PHMSA published in the Federal Register on April 24, 2026. If any adverse comment is received to a DFR PHMSA must rescind the rule and repropose. Click here to access the documents.
| Rulemaking | Description | Stage | Code |
|---|---|---|---|
| Pipeline Safety and Hazardous Materials Safety: Amendments to PHMSA Procedural Regulations | PHMSA proposed miscellaneous amendments to procedural regulations governing informal rulemaking for both pipeline safety and hazardous materials programs. | NPRM | 49 CFR Part 190 |
| Pipeline Safety: Interpretation Request Procedures | PHMSA amended interpretation procedures to require publication of interpretation requests on its website and provide an opportunity for public comment. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Declaratory Order Procedures | PHMSA established formal procedures for issuing declaratory orders through a new section in Part 190. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Consent Orders | PHMSA clarified that consent agreements may be used to resolve enforcement actions, including cases involving civil penalties. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Adjustment to OPID Notifications for Construction | PHMSA proposed adjusting the inflation-based threshold that triggers OPID notifications for certain construction and facility modification activities. | NPRM | 49 CFR Part 191 |
| Pipeline Safety: Eliminating Limitations on Welders and Welding Operators | PHMSA proposed allowing welders qualified through non-destructive testing methods to perform compressor station welding activities currently subject to additional restrictions. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Material Properties Verification During MAOP Reconfirmation | PHMSA proposed clarifying that material testing at pressure test manifold sites is not required when traceable, verifiable, and complete material records already exist. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Electronic Retention of Part 194 Response Plans | PHMSA amended regulations to allow operators to maintain electronic copies of response plans instead of paper copies. | DFR | 49 CFR Part 194 |
| Pipeline Safety: Remote Monitoring of Rectifiers | PHMSA proposed allowing remote monitoring technologies for rectifiers used in external corrosion control programs. | NPRM | 49 CFR Part 195 |
| Pipeline Safety: Clarifying Hazardous Liquid High-Consequence Area Designations | PHMSA amended HCA guidance to clarify spill considerations in agricultural fields and reorganize threat identification guidance. | DFR | 49 CFR Part 195 |
| Pipeline Safety: Timeframe to Make Rupture-Mitigation Valves Operational | PHMSA proposed extending the deadline for placing rupture-mitigation valves into operation from 14 days to 90 days after a pipeline enters service. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Hazardous Liquid Valve Maintenance Schedule | PHMSA proposed allowing operators to implement risk-based valve maintenance schedules, subject to a maximum inspection interval of one year. | NPRM | 49 CFR Part 195 |
| Pipeline Safety: Property Damage Definition for Incident Reporting | PHMSA proposes revising property damage thresholds for reportable gas and hazardous liquid pipeline incidents and clarifying applicability to telephonic notifications. | NPRM | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Remote Sensing Technologies for ROW Patrols | PHMSA proposes clarifying that unmanned aerial systems, satellites, and other remote-sensing technologies may be used to satisfy right-of-way patrol requirements. | NPRM | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Adjust Annual Report and NPMS Filing Timelines | PHMSA proposes extending annual report and NPMS submission deadlines for gas pipeline and storage operators to June 15 each year. | NPRM | 49 CFR Part 191 |
| Pipeline Safety: Editorial Corrections and Clarifications | PHMSA issued multiple final rules correcting editorial errors, updating references, removing obsolete submission methods, and improving regulatory clarity. | Final Rules | Various |
| Pipeline Safety: Update of Standards Incorporated by Reference | PHMSA issued multiple direct final rules updating incorporated industry consensus standards, including NFPA, ASTM, MSS, NACE, and ASME standards. | Multiple DFRs | 49 CFR Parts 192 & 195 |
Have questions about an upcoming deadline? Please reach out to Jessica Foley for assistance!
Conference News
Pipeline Pigging and Integrity Management Conference
The 39th International Pipeline Pigging & Integrity Management Conference (PPIM) will take place at the George R. Brown Convention Center in Houston. The event brings together pipeline operators, engineers, and industry professionals to explore advancements in pipeline inspection, integrity management, risk assessment, and emerging technologies.…
RCP Team Attending
Heather RoarkSales & Marketing Coordinator
Jessica FoleyVice President🎤 Featured Presentations
Topic to be determined

PSI Training Schedule

| Date | Training Course | Price | Registration |
|---|---|---|---|
| Nov 17 – Nov 19, 2026 | DOT Pipeline Compliance Workshop | $2,150 | SOLD OUT |
| Feb 16 – Feb 18, 2027 | Pipeline Safety Audit Training | $2,150 | Register → |
| Feb 23 – Feb 25, 2027 | Advanced Pipeline Risk Assessment Workshop | $2,150 | Register → |
| Mar 23 – Mar 25, 2027 | DOT Pipeline Compliance Workshop | $2,150 | Register → |
WEBINAR RECORDING!
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
RCP and the Pipeline Safety Institute offered a free webinar exploring the 2nd Editions of API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!
You asked and we listened!
Advanced DOT Pipeline Compliance Workshop is on the calendar!
This intensive and interactive 3-day, in-person workshop is designed for those who have previously completed our DOT Pipeline Compliance Workshop and are ready to take their knowledge to the next level.
New Workshop Alert!
Prepare Your Team for Pipeline Safety Audits with Confidence!
Our 3-day Pipeline Safety Audit Workshop is tailored for professionals responsible for the safe operation of hazardous liquid and natural gas pipelines. Designed for groups of 10-15 participants, this interactive training…
On-Site Training Request
We have conducted on-site training for oil and gas companies for over 25 years and can provide customized workshops for companies with groups of five or more.
We would welcome the opportunity to discuss our services with you.
Sincerely,
![]()
W. R. (Bill) Byrd, PE
President
RCP Inc.![]()
- Public Awareness Enforcement Guidance
- Missouri State Regulation Changes
- Georgia State Regulation Changes
- PHMSA Public Awareness Workshop
- PHMSA Workshop on Integrity Verification Process
- PHMSA Emergency Response Guidebook App
- Pipeline Regulations for iPhone
- AGA Award of Merit
- Summer Conference Schedule
- Ongoing Resources
- Regulatory Watch: Key Dates & Deadlines
- Conference News
- PSI Training Schedule


