What is TestOp?

TestOp® is the industry-leading application for Pipeline Pressure Test Validation in the field. The TestOp application uses engineering mass balance analysis to monitor real-time pressure test data, detecting possible leaks through sophisticated quantitative analysis that other methods can’t detect. Once the test passes, one-click is all it takes to generate comprehensive pressure test reports, complete with charts and calculations, ensuring compliance per US federal regulations (49 CFR 192 & 195). The final paperwork and test documentation package is done in seconds – while still in the field. No further analysis is required.

TestOp can be used to certify hydrostatic tests. TestOp users can also upload and validate previous pressure test data with ease, providing one centralized data repository for both recent and older tests.

What our clients say:

Calling the wrong result can be costly.
Avoid damages and lost revenues.

Pressure tests are costly, but not as costly as erroneously passing or failing them.

If an operator passes a bad pressure test, the ignored leak(s) might grow over time and result in a pipeline rupture that causes significant health, property, and environmental damages. Fines and payments for damages can easily exceed the cost of a pressure test by orders of magnitude.

If an operator incorrectly fails a good pressure test, it will cost them additional money to have the pipeline retested, not to mention loss of revenue due to the pipeline being out of commission.

Visually inspecting pipelines for leaks only works if the pipe is fully exposed and visible. If your pressure test contains buried pipe, which is the case for most pipeline pressure tests, then visually looking for leaks is simply not adequate.

In our pressure testing experience over the past 25 years, pinhole leaks on a pipeline can often be so small that the leaked water never makes it to the ground surface. This is exactly what happened in our highlighted case study. Other times, your pipe could be located in a muddy area, or it could rain on the day of the test; this would render visual inspection ineffective. Mass/volume balance is required to ensure that there was no loss of test medium due to leaks during a test.

Our industry is slowly, and correctly, moving away from using hold periods as a leak acceptance criteria. As an example, an operator who chooses this method might specify that a pipeline pressure test must have a period of 2 hours (out of 8 hours) with no pressure drop. One obvious problem with this method is that it does not address the rest of the test. Is the pipeline allowed to leak for the other 6 hours?

The other issue is that pressure is only one out of many variables in mass balance equations. Temperature and volume must also be taken into account. Temperature gains can often result in enough pressure gains to mask pressure losses due to leaks. And pressure losses can sometimes be a result of temperature losses, not leaks.