- PHMSA Gas Distribution Annual Report Revisions
- PHMSA Hazardous Liquid Annual Report Revisions
- PHMSA Electronic Pipeline Incident/Accident Reports
- New York State Gas Pipeline DIMP Regulations NYCRR16 Part 255
- TSA Data Collection for Pipeline Security
- DOT Federal Railroad Administration Advisory Notice
- PHMSA Public Forum State One-Call Exemptions March 14 – West Palm Beach, FL
- Meet me at the Conference
- PRCI 2013 Research Exchange Meeting
- NACE Corrosion 2013 Conference & Expo
- Ongoing Resources
- Regulatory Watch: Key Dates & Deadlines
- Conference News
- PSI Training Schedule
PHMSA Gas Distribution Annual Report Revisions
The Department of Transportation/Pipeline Hazardous Materials Safety Administration (PHMSA) is requesting Office of Management and Budget (OMB) approval for the revision of Form PHMSA F7100.1-1, Annual Report for Gas Distribution System. Proposed revisions include:
- Specify Commodity: Natural Gas, Synthetic Gas, Hydrogen Gas, Propane Gas, Landfill Gas and Other Gas. Operators will select a commodity group based on the predominant gas carried and complete the report for that commodity group.
- Specify Operator Type (new): Municipal, Privately Owned and Other (e.g., cooperatives, public utility districts).
- Additional Material Type: Adding “Reconditioned Cast Iron” as a pipe material and defining it as a cast iron gas distribution pipe that has been lined internally by use of suitable materials that ensure safe operation at a MAOP not to exceed the previously established MAOP. “Reconditioned Cast Iron” does not include cast iron pipe inserted with a gas pipe that is, by itself, suitable for gas service under Part 192.
- PHMSA has also proposed to revise leak cause categories and add excavation damage cause categories.
Submit comments on or before April 15, 2013 via the E-Gov Website. Identify the docket number, PHMSA–2013–0004, at the beginning of your comments.
For a copy of this Federal Register notice regarding revisions to the Gas Distribution Annual Report, contact Jessica Roger
PHMSA Hazardous Liquid Annual Report Revisions
PHMSA issued a notice and request for comments on proposed changes to its Form PHMSA F7000–1.1, Annual Report for Hazardous Liquid Pipeline Systems. Proposed revisions include:
- Obtain additional information on a state-by-state basis for information in Part D “Miles of Steel Pipe” by corrosion protection, and Part E “Miles of Electric Resistance Welded (ERW) Pipe” by State.
- Improve information collection on mileage of older pipe (Part I).
- Require reporting of actionable anomalies removed due to pipe replacement or abandonment (Part F).
- And, removal of sections A3, A6 and A8 which have limited value.
Submit comments on or before April 8, 2013 via the E-Gov Website. Identify the docket number, PHMSA–2013–0003, at the beginning of your comments.
For a copy of this Federal Register notice regarding revisions to the Hazardous Liquid Annual Report, contact Jessica Roger
PHMSA Electronic Pipeline Incident/Accident Reports
In December 2012, PHMSA revised forms PHMSA F 7100.2-Incident Report-Natural and Other Gas Transmission and Gathering Pipeline Systems and PHMSA F 7000-1-Accident Report-Hazardous Liquid Pipeline Systems. These revised forms are now available for electronic submittal in the PHMSA Portal. Visit the PHMSA website to see the revised forms and instructions. These forms should be used for all incidents/accidents that have occurred on or after January 1, 2010.
For a copy of this PHMSA Notice from the Federal Register, contact Jessica Roger
New York State Gas Pipeline DIMP Regulations NYCRR16 Part 255
On February 26, 2013 the New York Public Service Commission adopted amendments to 16 NYCRR Part 255 adding Gas Distribution Pipeline Integrity Management (GDPIM) regulations. The revised Chapter III, Gas Utilities, Subchapter C, Safety, Part 255, Transmission and Distribution of Gas; includes:
- §255.1001 Definitions that apply to sections 255.1003 through 255.1015.
- §255.1003 General requirements of a GDPIM plan.
- §255.1005 Implementation requirements of a GDPIM plan.
- §255.1007 Required elements of a GDPIM plan.
- §255.1009 Required report when compression couplings fail.
- §255.1011 Records an operator must keep.
- §255.1013 Deviations from required periodic inspections.
- §255.1015 Requirements a small liquefied petroleum gas (LPG) operator must satisfy to implement a GDPIM plan.
For a copy of New York State’s GDPIM, contact Donna Williams
TSA Data Collection for Pipeline Security
The Transportation Security Administration (TSA) issued a notice and request for comments regarding their request to the OMB to renew an existing information collection authority for the Pipeline Corporate Security Review (PCSR) Program. The purpose of the PCSR program is to develop first-hand knowledge of a pipeline operator’s corporate security policies and procedures, establish and maintain working relationships with key pipeline security personnel, and identify best practices observed at individual facilities to help enhance and improve the security of the pipeline industry. The data collection will assess the current security practices in the pipeline industry which includes site visits and interviews, and is part of the larger domain for awareness, prevention and protection program supporting the TSA’s and Department of Homeland Security’s missions.
Comments are due by April 29, 2013 and can be TSAPRA@dhs.gov For a copy of this TSA notice and request for comments, contact Jessica Roger
DOT Federal Railroad Administration Advisory Notice
In response to Safety Recommendation R-12-04 issued by the National Transportation Safety Board (NTSB), the Federal Railroad Administration (FRA) issued an Advisory Notice to inform railroads of the circumstances surrounding the June 19, 2009, derailment of eastbound Canadian National Railway Freight Train U70691-18 in Cherry Valley, IL. The Advisory Notice also reminds railroads of the need to immediately notify pipeline operators of rail accidents occurring in railroad rights-of-way where pipelines are present and the need to ensure that pipeline inspections are accomplished prior to resumption of service.
For a copy of this FRA Advisory Notice, contact Jessica Roger
PHMSA Public Forum State One-Call Exemptions March 14 – West Palm Beach, FL
The Pipeline and Hazardous Materials Safety Administration (PHMSA) will sponsor a public forum on state one-call exemptions to discuss the requirements of the Pipeline Safety, Regulatory Certainty and Job Creation Act of 2011 relating to exemptions in state one-call programs and actions taken to date. In addition, damage prevention stakeholders will discuss existing data relating to this topic and present perspectives during panel discussions. The forum is open to all and there is no cost to attend.
- Date: Thursday, March 14, 2013 (9:30 a.m. to 5:30 p.m. EST)
- Location: Palm Beach County Convention Center, 650 Okeechobee Boulevard, West Palm Beach, Florida, 33401.
- Registration: To help assure that adequate space is provided, all attendees are encouraged to register for the workshop. Name badge pickup and onsite registration will be available starting at 8:30 a.m. A preliminary agenda and additional information can be found on this PHMSA meeting webpage.
Please note that the public forum will be webcast live and presentations will be available on the forum Website within 30 days following the public forum.
PHMSA is holding the forum at this location because it is the same location where the Common Ground Alliance (CGA) 811 Excavation Safety Conference & Expo will be held March 11–14 and many of the likely attendees for the PHMSA Forum will participate in the CGA Excavation Safety Conference. Attendees can make hotel arrangements for the PHMSA Forum under the CGA room block at a rate of $199.00 per night. Further details can be found on the CGA website. Written comments, either before or after the workshop, should reference Docket No. PHMSA–2013–0029 and may be submitted via the E-Gov Website. For further information, contact: Annmarie Robertson, Office of Pipeline Safety, at 317–253–1622 or email at annmarie.robertson@dot.gov
Meet me at the Conference
Have you registered and confirmed your reservations for these upcoming conferences? RCP will have representatives and Exhibits at NACE, API and AGA. We hope to see you there!
API Pipeline Conference April 16 & 17
April 16 – 17 (San Diego, CA)
AGA Ops Conference & Biennial Exhibition
May 21 – 23 (Orlando, FL)
PRCI 2013 Research Exchange Meeting
The Pipeline Research Council International held its 7th annual Research Exchange meeting on February 5 – 7, 2013 in Grapevine, Texas (near Dallas) with nearly 300 attendees from around the world, including PRCI member company representatives, key researchers and stakeholders in the pipeline industry.
Results from the past year from over 50 PRCI research projects that focused on improving pipeline safety and integrity were reviewed. Sessions highlighting research challenges and results in several areas of interest to hazardous liquids and natural gas pipelines included: damage prevention, emergency response, stress corrosion cracking, leak detection, mechanical damage assessment, materials and welding, NDE methods and ILI technologies. Important results from the first phase of work on using ILI for discrepancy analysis on pipelines for verifying MOP and MAOP should become available within the next month.
Additional information can be found on the PRCI website.
NACE Corrosion 2013 Conference & Expo
March 17 – 21 Orlando County Convention Center
RCP Integrity Services is proud to exhibit in Booth #930 at Corrosion 2013. If you plan on attending and have not registered yet, online registration ends March 14! More than 5,000 corrosion professionals will convene from around the world to participate in the technical symposia, committee meetings, seminars and lectures, training opportunities, and networking venues to obtain invaluable information for their careers and share knowledge with their peers. The preliminary agenda, registration and hotel information can be found on the NACE website. Stop by booth #930 to discuss our services and register to win an iPad. We look forward to seeing you at Corrosion 2013 in Orlando.
These articles are maintained and updated as new information becomes available.
Regulatory Watch: Key Dates & Deadlines
Welcome to Regulatory Watch! In this monthly update, we’ll keep you informed on proposed rule comment periods, effective dates, and upcoming deadlines for various compliance requirements.
Administrative Rulemaking Regulatory Procedures
All Liquid HCA segments capable of ILI § 195.452(n)
Amendments to Liquefied Natural Gas Facilities
Breakout Tank
Coastal Ecological Unusually Sensitive Areas
Cost Recovery for Siting Reviews for LNG Facilities
Gas Pipeline Leak Detection and Repair
Gas Transmission: Assessments Outside HCAs § 192.710
Oil Spill Response Plans, Accident Notifications, Inspections and Investigations and other Miscellaneous Pipeline Safety Changes
Pipeline Operational Status
Repair Criteria for Gas and Hazardous Liquid Pipelines
Safety of Carbon Dioxide and Hazardous Liquid Pipelines
Safety of Gas Distribution Pipelines and Other Pipeline Safety Initiatives
Sprint I & II Update
To further the Administration’s deregulatory policies, PHMSA has published in today’s Federal Register twenty-eight (28) separate rulemaking actions affecting the pipeline safety regulations (PSR; Parts 190-199). Click here to access the documents.
| Rulemaking | Description | Stage | Code |
|---|---|---|---|
| Pipeline Safety: Rationalize Special Permit Conditions | PHMSA proposes to amend its special permit procedures to ensure permit conditions are directly tied to the specific pipeline safety regulations being waived. | NPRM | 49 CFR Part 190 |
| Pipeline Safety: Rationalize Calculation of Regulatory Filing and Compliance Deadlines | PHMSA will clarify that regulatory filing and compliance deadlines falling on weekends or Federal holidays automatically move to the next business day. | DFR | 49 CFR Part 190 |
| Pipeline Safety: Adjust Annual Report Filing Timelines | PHMSA will amend annual reporting requirements to move the gas pipeline annual report submission deadline from March to June. | DFR | 49 CFR Part 191 |
| Pipeline Safety: Property Damage Definition for Incident Reporting | PHMSA will clarify incident reporting property damage calculations for gas pipelines and update hazardous liquid accident reporting thresholds using inflation-adjusted criteria. | DFR | 49 CFR Parts 191 & 195 |
| Pipeline Safety: Exception for In-Plant Piping Systems | PHMSA proposes to clarify that in-plant piping systems are not subject to federal pipeline safety regulations. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Codify Enforcement Discretion on Incidental Gathering Lines | PHMSA proposes to codify enforcement discretion clarifying that restrictions on the historical incidental gathering line exemption apply only to newly constructed lines. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Eliminate Burdensome Coating Assessment Deadlines | PHMSA proposes to replace prescriptive deadlines for coating damage assessments and remediation with a requirement that activities be completed before the pipeline is placed in service. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Atmospheric Corrosion Reassessment for Pipeline Replacements | PHMSA proposes to remove the 3-year reassessment interval following replacement of atmospheric corrosion defects and allow use of the standard 5-year reassessment interval. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Harmonize Class Change Pressure Test Requirements | PHMSA proposes to reduce the minimum pressure test duration following certain class location changes from 8 hours to 4 hours, aligning with existing Subpart J requirements. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Clarify MAOP Reconfirmation Testing Records | PHMSA will issue a technical correction clarifying that operators may use pre-1970s pressure test records when reconfirming MAOP under §192.624. | Final Rule | 49 CFR Part 192 |
| Pipeline Safety: Remote Sensing Technologies for ROW Patrols | PHMSA will explicitly allow right-of-way patrols to be conducted using unmanned aircraft systems, satellites, and other remote sensing technologies. | DFR | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Technical Standards Updates and Amendments | PHMSA will update incorporated standards and make technical amendments in response to an industry petition for reconsideration. | Final Rule | 49 CFR Part 192 |
| Pipeline Safety Program: Update of Standards Incorporated by Reference | PHMSA issued multiple direct final rules updating incorporated industry consensus standards used throughout Parts 192 and 195, replacing outdated editions with current versions. | Multiple DFRs | 49 CFR Parts 192 & 195 |
The following is a summary of the 40 rulemakings that PHMSA published in the Federal Register on April 24, 2026. If any adverse comment is received to a DFR PHMSA must rescind the rule and repropose. Click here to access the documents.
| Rulemaking | Description | Stage | Code |
|---|---|---|---|
| Pipeline Safety and Hazardous Materials Safety: Amendments to PHMSA Procedural Regulations | PHMSA proposed miscellaneous amendments to procedural regulations governing informal rulemaking for both pipeline safety and hazardous materials programs. | NPRM | 49 CFR Part 190 |
| Pipeline Safety: Interpretation Request Procedures | PHMSA amended interpretation procedures to require publication of interpretation requests on its website and provide an opportunity for public comment. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Declaratory Order Procedures | PHMSA established formal procedures for issuing declaratory orders through a new section in Part 190. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Consent Orders | PHMSA clarified that consent agreements may be used to resolve enforcement actions, including cases involving civil penalties. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Adjustment to OPID Notifications for Construction | PHMSA proposed adjusting the inflation-based threshold that triggers OPID notifications for certain construction and facility modification activities. | NPRM | 49 CFR Part 191 |
| Pipeline Safety: Eliminating Limitations on Welders and Welding Operators | PHMSA proposed allowing welders qualified through non-destructive testing methods to perform compressor station welding activities currently subject to additional restrictions. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Material Properties Verification During MAOP Reconfirmation | PHMSA proposed clarifying that material testing at pressure test manifold sites is not required when traceable, verifiable, and complete material records already exist. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Electronic Retention of Part 194 Response Plans | PHMSA amended regulations to allow operators to maintain electronic copies of response plans instead of paper copies. | DFR | 49 CFR Part 194 |
| Pipeline Safety: Remote Monitoring of Rectifiers | PHMSA proposed allowing remote monitoring technologies for rectifiers used in external corrosion control programs. | NPRM | 49 CFR Part 195 |
| Pipeline Safety: Clarifying Hazardous Liquid High-Consequence Area Designations | PHMSA amended HCA guidance to clarify spill considerations in agricultural fields and reorganize threat identification guidance. | DFR | 49 CFR Part 195 |
| Pipeline Safety: Timeframe to Make Rupture-Mitigation Valves Operational | PHMSA proposed extending the deadline for placing rupture-mitigation valves into operation from 14 days to 90 days after a pipeline enters service. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Hazardous Liquid Valve Maintenance Schedule | PHMSA proposed allowing operators to implement risk-based valve maintenance schedules, subject to a maximum inspection interval of one year. | NPRM | 49 CFR Part 195 |
| Pipeline Safety: Property Damage Definition for Incident Reporting | PHMSA proposes revising property damage thresholds for reportable gas and hazardous liquid pipeline incidents and clarifying applicability to telephonic notifications. | NPRM | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Remote Sensing Technologies for ROW Patrols | PHMSA proposes clarifying that unmanned aerial systems, satellites, and other remote-sensing technologies may be used to satisfy right-of-way patrol requirements. | NPRM | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Adjust Annual Report and NPMS Filing Timelines | PHMSA proposes extending annual report and NPMS submission deadlines for gas pipeline and storage operators to June 15 each year. | NPRM | 49 CFR Part 191 |
| Pipeline Safety: Editorial Corrections and Clarifications | PHMSA issued multiple final rules correcting editorial errors, updating references, removing obsolete submission methods, and improving regulatory clarity. | Final Rules | Various |
| Pipeline Safety: Update of Standards Incorporated by Reference | PHMSA issued multiple direct final rules updating incorporated industry consensus standards, including NFPA, ASTM, MSS, NACE, and ASME standards. | Multiple DFRs | 49 CFR Parts 192 & 195 |
Have questions about an upcoming deadline? Please reach out to Jessica Foley for assistance!
Regulatory Watch
RCP Regulatory Rulemaking Report | Updated October 18, 2026
This report reflects published Regulatory Watch records maintained by RCP. Dates and references are displayed only where entered.
Proposed (7)
| Rulemaking | Reference | Milestones |
|---|---|---|
| Administrative Rulemaking Regulatory ProceduresProposed |
RIN: 2137-AF63
Federal Register: PHMSA-2026-1555
|
No dates recorded |
| Amendments to Liquefied Natural Gas FacilitiesProposed |
RIN: 2137-AF45
Federal Register: PHMSA-2019-0091
|
No dates recorded |
| Breakout TankProposed |
RIN: 2137-AG22
Federal Register: PHMSA-2025-1271
|
No dates recorded |
| Oil Spill Response Plans, Accident Notifications, Inspections and Investigations and other Miscellaneous Pipeline Safety ChangesProposed |
RIN: 2137-AF37
Federal Register: PHMSA-2018-0047
|
No dates recorded |
| Pipeline Operational StatusProposed |
RIN: 2137-AF52
Federal Register: NA
|
No dates recorded |
| Repair Criteria for Gas and Hazardous Liquid PipelinesProposed |
RIN: 2137-AF44
Federal Register: PHMSA-2025-0019
|
Comments close: Sep 8, 2026 |
| Safety of Carbon Dioxide and Hazardous Liquid PipelinesProposed |
RIN: 2137-AF60
Federal Register: NA
|
No dates recorded |
Final (4)
| Rulemaking | Reference | Milestones |
|---|---|---|
| Coastal Ecological Unusually Sensitive AreasFinal |
RIN: 2137-AF31
Federal Register: PHMSA-2017-0152, Amdt. No. 195-104
|
No dates recorded |
| Cost Recovery for Siting Reviews for LNG FacilitiesFinal |
RIN: 2137-AF61
Federal Register: PHMSA-2022-0118
|
No dates recorded |
| Gas Pipeline Leak Detection and RepairFinal |
RIN: 2137-AF51
Federal Register: PHMSA-2021-0039
|
No dates recorded |
| Safety of Gas Distribution Pipelines and Other Pipeline Safety InitiativesFinal |
RIN: 2137-AF53
Federal Register: PHMSA-2021-0046
|
No dates recorded |
Implementation (2)
| Rulemaking | Reference | Milestones |
|---|---|---|
| All Liquid HCA segments capable of ILI § 195.452(n)Implementation |
RIN: Not available
Federal Register: Not available
|
Effective / implementation date: Jul 2, 2040 |
| Gas Transmission: Assessments Outside HCAs § 192.710Implementation |
RIN: Not available
Federal Register: Not available
|
Comments close: Sep 8, 2026 Effective / implementation date: Jul 3, 2034 |
Conference News
PSI Training Schedule

WEBINAR RECORDING!
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
RCP and the Pipeline Safety Institute offered a free webinar exploring the 2nd Editions of API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!
You asked and we listened!
Advanced DOT Pipeline Compliance Workshop is on the calendar!
This intensive and interactive 3-day, in-person workshop is designed for those who have previously completed our DOT Pipeline Compliance Workshop and are ready to take their knowledge to the next level.
New Workshop Alert!
Prepare Your Team for Pipeline Safety Audits with Confidence!
Our 3-day Pipeline Safety Audit Workshop is tailored for professionals responsible for the safe operation of hazardous liquid and natural gas pipelines. Designed for groups of 10-15 participants, this interactive training…
On-Site Training Request
We have conducted on-site training for oil and gas companies for over 25 years and can provide customized workshops for companies with groups of five or more.
We would welcome the opportunity to discuss our services with you.
Sincerely,
![]()
W. R. (Bill) Byrd, PE
President
RCP Inc.![]()
- PHMSA Gas Distribution Annual Report Revisions
- PHMSA Hazardous Liquid Annual Report Revisions
- PHMSA Electronic Pipeline Incident/Accident Reports
- New York State Gas Pipeline DIMP Regulations NYCRR16 Part 255
- TSA Data Collection for Pipeline Security
- DOT Federal Railroad Administration Advisory Notice
- PHMSA Public Forum State One-Call Exemptions March 14 – West Palm Beach, FL
- Meet me at the Conference
- PRCI 2013 Research Exchange Meeting
- NACE Corrosion 2013 Conference & Expo
- Ongoing Resources
- Regulatory Watch: Key Dates & Deadlines
- Conference News
- PSI Training Schedule