DOT Pipeline Compliance Workshop – November 4 & 5, 2008

RCP will be hosting our very popular 2-day workshop on DOT Pipeline Compliance on November 4 & 5, 2008, in Houston, TX. Join us for an informative, lively, and interactive workshop on DOT Pipeline Compliance.

Day 1 (November 4): Gas Pipeline Regulations (49CFR192): Covering all the topics below but special emphasis will be placed on the changes in **GAS GATHERING** regulations.

Day 2 (November 5): Liquid Pipeline Regulations (49CFR195)

Each day of the workshop will address the following issues as they specifically relate to either Gas or Hazardous Liquid pipelines:

  • PHMSA Overview
  • PHMSA Jurisdictional Boundaries
  • Compliance Requirements:
  • New/Proposed Regulations – including liquid rural low stress and new gas production pipeline rules in Texas and other states.

For additional information go to our website here.

PHMSA Notice of Proposed Rulemaking on Control Room Management

[Docket ID PHMSA-2007-27954]

The Department of Transportation Pipeline and Hazardous Materials Safety Administration (DOT/PHMSA) issued a Notice of Proposed Rulemaking (NOPR) to revise the Federal pipeline safety regulations to address human factors and other components of control room management. The proposed rules would require operators of hazardous liquid pipelines, gas pipelines, and liquefied natural gas facilities to amend their existing written O&M; procedures, operator qualification (OQ) programs, and emergency plans to assure controllers and control room management practices and procedures used maintain pipeline safety and integrity. This proposed rule would add provisions to 49 CFR parts 192, 193, and 195. As part of the Prevention through People (PTP) program, this proposed rule addresses requirements applicable to controllers, key players among the people who can affect pipeline safety. The rule focuses on the enhancement areas identified by PHMSA in its earlier public meetings, including alarm management, controller qualifications, controller human factors, and management of change.

Written comments are due by November 12, 2008 and may be submitted to the E-Gov Web site at www.regulations.gov. Reference Docket No. PHMSA-2007-27954. PHMSA will consider late comments filed so far as practical.

For a copy of the proposed rule on Control Room Management, contact Jessica Roger.

AGA Control Management Workshop

AGA will hold a Control Room Management Workshop on Thursday, October 30th at the Embassy Suites Dulles North, VA. This workshop will serve as a forum for government and industry to explain their views of the intent of the proposed regulation. For more information (including a draft agenda) and online registration can be found on the AGA Website.

PHMSA Proposed Security Plan Requirements

Docket No. PHMSA-06-25885 (HM-232F)

The Pipeline and Hazardous Materials Safety Administration (PHMSA) is proposing to modify its current security plan requirements (49 CFR 172) governing the commercial transportation of hazmat by air, rail, vessel, and highway. To determine the types of materials that should be subject to security planning requirements, PHMSA evaluated specific transportation scenarios in which a terrorist could deliberately use hazardous materials to cause large-scale casualties and property damage. The proposed rule would narrow the list of materials subject to security plan requirements.

Comments to the proposed rule changes to the Security Plan Requirements are due by November 10, 2008 to www.regulations.gov — use docket number PHMSA-06-25885 on all correspondence.

For a copy of the proposed changes to the Security Plan Requirements (including a table summarizing the list of hazardous materials for which Transportation Security Plans will be required), contact Jessica Roger.

Need A Security Plan or Audit?

We have the expertise to develop a security plan and perform risk assessments for pipeline and terminal facilities to meet recent DOT Hazmat Transportation & Pipeline regulations. We can also assist you in USCG security plans for dock facilities and vessels. Please contact Jessica Roger for more information.

MMS Reporting for Damage Caused by Hurricanes Gustav and Ike

NTL No. 2008-G18 / Effective date: September 25, 2008

The U.S. Dept. of the Interior, Minerals Management Service (MMS) issued a notice to lessees and operators in the Gulf of Mexico OCS region, NTL No. 2008-G18 (which supersedes NTL No. 2008-G16, effective 9-11-08) to elaborate on the inspections you need to conduct and the plans and reports you need to prepare because of known and potential damage to OCS facilities caused by Hurricanes Gustav and Ike. You may access a map of the affected area on the MMS Internet website. The MMS GOMR has determined that you must perform the following surveys on all fixed OCS platforms located in the affected areas of both hurricanes:

  • Level I survey before you man a platform located in the affected area.
  • Level II & III underwater surveys may be necessary (see full text for details)
  • Level IV survey if a Level III survey detects significant structural damage

Surveys should begin immediately, and the MMS GOMR encourages you to inspect the older platforms located nearest the eye center storm track. Complete all surveys by March 31, 2009 and correct any damage to a platform before June 1, 2009. NTL 2008-G18 outlines the steps for Emergency Repair notification to the MMS. If you make emergency repairs on a floating platform, you must also notify the US Coast Guard.

By November 1, 2008, submit the inspection information listed below by e-mail to structures@mms.gov:

  • A list of all your OCS platforms in the affected area;
  • For each listed platform, an initial inspection plan
  • A timetable that shows how you will complete all inspections by March 31, 2009

For more information or the full text of NTL No. 2008-G18, contact Jessica Roger.

Gas Distribution Integrity Management Programs (DIMP) Comment Period Extended

The Pipeline Hazardous Materials Safety Administration (PHMSA) is extending the period for public comment to give interested persons an additional 30 days to comment on a proposed rule to amend the Federal Pipeline Safety Regulations to require operators of gas distribution pipelines to develop and implement integrity management programs. Please reference RCP's newsletter article on the proposed rule in the July 2008 edition of DOT Pipeline Compliance News. PHMSA is extending the period for written comments on the proposed rule until October 23, 2008, and will consider late filed comments so far as practicable. Comments should reference Docket No. PHMSA-RSPA-2004-19854 and may be submitted to the E-Gov Web Site: http://www.regulations.gov.

For a copy of the DIMP proposed rulemaking, or for information on how RCP can support the development activities of a DIMP, please contact Jessica Roger.

Workshop on Anomaly Assessment and Repair

Docket ID PHMSA-2008-0255

PHMSA is sponsoring a Workshop on Assessment and Repair of Anomalies in Pipelines to allow stakeholders of the pipeline safety community to learn about and discuss recent research results, current evaluation practices, and methods to assure pipeline safety. The discussion of current evaluation practices and methods to assure pipeline safety should include: A review of safety factors used to evaluate anomalies when assessing in-line tool and excavation results, review of how outside forces and overpressure may affect anomaly stresses, how ILI tool accuracy is applied to anomaly evaluation, and how anomaly growth rates in assessments are considered. This will include a discussion of recent research indicating that existing methods of predicting the remaining strength of corroded pipe could provide non-conservative results (i.e., the pipe will fail at a pressure lower than that predicted) in some circumstances. Non-conservative results could be obtained even when the dimensions of pipeline anomalies are known with precision.

The workshop will be held at the Gaylord National Resort and Convention Center, 201 Waterfront Street, National Harbor, MD 20745 on October 22, 2008. Name badge pick-up and on-site registration will be available starting at 7:30 a.m. with the agenda taking place from 8 a.m. until approximately 5 p.m. Refer to the Meeting Web Site for updated agenda and times.

Please note: the workshop will not be Webcast. However, presentations will be available on the Meeting Web Site within 30 days following the workshop. Hotel reservations under the "United States Department of Transportation #2" room block for the night of October 21, 2008, can be made at 1-301-965-2000. A daily rate of $233 is available. The meeting room will be posted at the hotel on the day of the workshop.

2008 International Pipeline Conference

The International Pipeline Conference (IPC) was held September 30 – October 3, in Calgary, AB, Canada. RCP presented the following technical papers / poster session:

  • Best Practices in Damage Prevention for Parallel Construction Projects – Bill Byrd, P.E.
  • Pipeline Integrity Management – Estimating and Prioritizing the Risk Resulting from Pipeline Facility Operations – Larry Decker, P.E.
  • What tools are available to help maintain a code compliant MAOP for a highly complex and changing gas pipeline system? – Larry Decker, P.E.
  • Transfers of Ownership: The Devil is in the Details – Ken Palmer, PhD

The RCP Hideout was a big success, with 3 lucky winners of Wii’s! RCP used their compliance management system software to track and announce scores for each participant during the contest, with automatic e-mail updates. This provided a simple, real-world demonstration of the software’s flexibility and ease of use.

If you would like a copy of any of the papers, or a demonstration of our compliance management software, please contact Jessica Roger.

Damage Prevention Plans

RCP can develop or update your Damage Prevention plan. For more information about how RCP can assist you with your Damage Prevention Plan, click here.

Michigan Proposed Rule Revision to Gas Safety Standards

The Michigan Public Service Commission is considering the revision of rules governing gas safety standards, located at R 460.20101 to R 460.20606. These proposed rule revisions will incorporate existing federal gas safety standards into the Michigan gas safety standards. The Commission will hold a public hearing October 28, 2008, at 9 a.m. in Lansing, Michigan, to solicit comments on the proposed rules. The rules are proposed to take effect immediately upon filing with the Secretary of State.

Written and electronic comments may be filed with the Commission and must be received no later than 5:00 p.m. on November 18, 2008, to mpscedockets@michigan.gov.

For a copy of the proposed ruling, contact Jessica Roger.

New Jersey Proposed Rule Changes for Natural Gas Pipelines

40 NJR 4915(a)

The New Jersey Board of Public Utilities (Board) is proposing rule changes regarding various aspects of natural gas pipelines (N.J.A.C. 14:7), which address the construction, operation, and maintenance of natural gas transmission and distribution pipelines. These rules explain where pipelines may be constructed, and set requirements for ensuring that the pipelines remain safe both during and after installation. The rules also set specifications that pipeline operators must follow when installing, inspecting, operating and maintaining natural gas pipelines. Some of the changes that should be noted are:

  • Amendments are proposed to clarify that the rules apply to both transmission and distribution lines and that the pipeline operator is the person responsible for compliance.
  • Require that all pipelines constructed in New Jersey in the future meet standards for a Class 4 pipeline location.
  • A reference to the Federal code is added, including the requirements for an integrity management program in 49 CFR 192, Subpart O.
  • Proposed new section provides much more specific and measurable requirements for the number and spacing of valves on distribution lines, and includes factors the operator must consider in determining the appropriate number and spacing of valves. The proposed new section also requires pipeline operators to file an evaluation report with Board staff regarding the number and spacing of valves.
  • Proposed new section N.J.A.C. 14:7-1.11 governs the installation of pipe and its requirements are more stringent than corresponding Federal regulations at 49 CFR 192.325. It requires all gas pipelines to be installed with at least 12 inches separation from any other subsurface structure or facility, whereas the corresponding Federal regulations require 12 inches separation only for the installation of transmission pipelines. It also specifies size and type of wire required for tracer wire on plastic pipe installations. These specifications are more stringent than the corresponding Federal regulations at 49 CFR 192.321, which do not govern the size and type of wire.
  • Proposed new section requires damage prevention efforts consistent with the requirements of Federal regulations at 49 CFR 192.614; requires an operator to take additional measures when the operator becomes aware of potential high risk excavations, such as performing on-site inspection, coordinating with the excavator, continuing surveillance, and checking/verifying clear access to gas valves that may be operated in an emergency. Also, an operator must provide training for operator personnel in preparation for potential high risk excavations around underground gas facilities.

Comments may be submitted through November 1, 2008 by email in Microsoft Word format, or in a format that can be easily converted to Word, to rule.comments@bpu.state.nj.us.

For a copy of the proposed amendments, new rules and repeals, contact Jessica Roger.

Interested in Web-Based Compliance Management Systems?

RCP has the latest technology to help manage all of your permits, inspections, procedures, and data requirements and neatly organize them into one overall compliance assurance system. This includes regulatory tasking, data management, and exception reporting. Because it is web-based, there are no IT issues to struggle through to get started. An institutional memory is created of the compliance history and ongoing compliance requirements, despite operator or personnel turnover. For more information, click here to contact Jessica Roger.

Pipeline Informed Planning Alliance (PIPA) Update

The PIPA initiative involves a broad stakeholder group working together to develop more detailed guidance for property development in the vicinity of transmission pipelines. (See related article in the DOT Compliance News February 2008 edition.) A draft report is expected by the end of October, which will be distributed to participating PIPA organizations for review/comments that will be due by December. Stakeholder comments will be incorporated during January 2009, with the goal of posting the final PIPA product on the PHMSA Communications website by February 1, 2009.

SPCC Rule Update

The US Environmental Protection Agency (EPA) sent the Oil Spill Prevention, Control, and Countermeasure “loose Ends” final rule to the Office of Management and Budget (OMB) at the end of August 2008 for 60-day review. EPA had committed to getting the final rule published by July 2008. EPA is now aiming to get OMB approval and to issue the final rule by October 31, 2008.

2008 International Pipeline Security Forum

The International Pipeline Security Forum (IPSF) will be held in Salt Lake City, UT at the Hilton Salt Lake City Center Hotel on October 29 & 30, 2008. The Forum is sponsored by the Transportation Security Administration (TSA) in collaboration with Natural Resources Canada. Registration and attendance at the forum is limited to pipeline, energy and security representatives and officials from private industry and government. This event is not open to the general public and media. IPSF Registration is free and hotel reservations can be made directly with the Hilton Salt Lake City Center Hotel no later than Sunday, September 28, 2008 for the discounted room rate.

Forum registration procedures and hotel reservation information can be found at the TSA Website.

The Forum agenda is currently being developed. Click here for the Draft Agenda.

Ongoing Resources

These articles are maintained and updated as new information becomes available.

Last Updated: October 2026

Regulatory Watch: Key Dates & Deadlines

Welcome to Regulatory Watch! In this monthly update, we’ll keep you informed on proposed rule comment periods, effective dates, and upcoming deadlines for various compliance requirements.

2137-AF63Proposed Rule Stage

Administrative Rulemaking Regulatory Procedures

ProposedDate not available
FinalNot yet published
ImplementationNot yet established
Regulatory WatchImplementation Stage

All Liquid HCA segments capable of ILI § 195.452(n)

ProposedDate not available
FinalDate not available
ImplementationJul 2, 2040
2137-AF45Proposed Rule Stage

Amendments to Liquefied Natural Gas Facilities

ProposedDate not available
FinalNot yet published
ImplementationNot yet established
2137-AG22Proposed Rule Stage

Breakout Tank

ProposedDate not available
FinalNot yet published
ImplementationNot yet established
2137-AF61Final Rule Stage

Cost Recovery for Siting Reviews for LNG Facilities

ProposedDate not available
FinalDate not available
ImplementationNot yet established
2137-AF51Final Rule Stage

Gas Pipeline Leak Detection and Repair

ProposedDate not available
FinalDate not available
ImplementationNot yet established
Regulatory WatchImplementation Stage

Gas Transmission: Assessments Outside HCAs § 192.710

ProposedDate not available
Public comments ClosedCloses Sep 8, 2026
FinalDate not available
ImplementationJul 1, 2034
2137-AF37Proposed Rule Stage

Oil Spill Response Plans, Accident Notifications, Inspections and Investigations and other Miscellaneous Pipeline Safety Changes

ProposedDate not available
FinalNot yet published
ImplementationNot yet established
2137-AF52Proposed Rule Stage

Pipeline Operational Status

ProposedDate not available
FinalNot yet published
ImplementationNot yet established
2137-AF44Proposed Rule Stage

Repair Criteria for Gas and Hazardous Liquid Pipelines

ProposedDate not available
FinalNot yet published
ImplementationNot yet established
2137-AF60Proposed Rule Stage

Safety of Carbon Dioxide and Hazardous Liquid Pipelines

ProposedDate not available
FinalNot yet published
ImplementationNot yet established
2137-AF53Final Rule Stage

Safety of Gas Distribution Pipelines and Other Pipeline Safety Initiatives

ProposedDate not available
FinalDate not available
ImplementationNot yet established

Sprint I & II Update

To further the Administration’s deregulatory policies, PHMSA has published in today’s Federal Register twenty-eight (28) separate rulemaking actions affecting the pipeline safety regulations (PSR; Parts 190-199). Click here to access the documents.

Rulemaking Description Stage Code
Pipeline Safety: Rationalize Special Permit Conditions PHMSA proposes to amend its special permit procedures to ensure permit conditions are directly tied to the specific pipeline safety regulations being waived. NPRM 49 CFR Part 190
Pipeline Safety: Rationalize Calculation of Regulatory Filing and Compliance Deadlines PHMSA will clarify that regulatory filing and compliance deadlines falling on weekends or Federal holidays automatically move to the next business day. DFR 49 CFR Part 190
Pipeline Safety: Adjust Annual Report Filing Timelines PHMSA will amend annual reporting requirements to move the gas pipeline annual report submission deadline from March to June. DFR 49 CFR Part 191
Pipeline Safety: Property Damage Definition for Incident Reporting PHMSA will clarify incident reporting property damage calculations for gas pipelines and update hazardous liquid accident reporting thresholds using inflation-adjusted criteria. DFR 49 CFR Parts 191 & 195
Pipeline Safety: Exception for In-Plant Piping Systems PHMSA proposes to clarify that in-plant piping systems are not subject to federal pipeline safety regulations. NPRM 49 CFR Part 192
Pipeline Safety: Codify Enforcement Discretion on Incidental Gathering Lines PHMSA proposes to codify enforcement discretion clarifying that restrictions on the historical incidental gathering line exemption apply only to newly constructed lines. NPRM 49 CFR Part 192
Pipeline Safety: Eliminate Burdensome Coating Assessment Deadlines PHMSA proposes to replace prescriptive deadlines for coating damage assessments and remediation with a requirement that activities be completed before the pipeline is placed in service. NPRM 49 CFR Part 192
Pipeline Safety: Atmospheric Corrosion Reassessment for Pipeline Replacements PHMSA proposes to remove the 3-year reassessment interval following replacement of atmospheric corrosion defects and allow use of the standard 5-year reassessment interval. NPRM 49 CFR Part 192
Pipeline Safety: Harmonize Class Change Pressure Test Requirements PHMSA proposes to reduce the minimum pressure test duration following certain class location changes from 8 hours to 4 hours, aligning with existing Subpart J requirements. NPRM 49 CFR Part 192
Pipeline Safety: Clarify MAOP Reconfirmation Testing Records PHMSA will issue a technical correction clarifying that operators may use pre-1970s pressure test records when reconfirming MAOP under §192.624. Final Rule 49 CFR Part 192
Pipeline Safety: Remote Sensing Technologies for ROW Patrols PHMSA will explicitly allow right-of-way patrols to be conducted using unmanned aircraft systems, satellites, and other remote sensing technologies. DFR 49 CFR Parts 192 & 195
Pipeline Safety: Technical Standards Updates and Amendments PHMSA will update incorporated standards and make technical amendments in response to an industry petition for reconsideration. Final Rule 49 CFR Part 192
Pipeline Safety Program: Update of Standards Incorporated by Reference PHMSA issued multiple direct final rules updating incorporated industry consensus standards used throughout Parts 192 and 195, replacing outdated editions with current versions. Multiple DFRs 49 CFR Parts 192 & 195

The following is a summary of the 40 rulemakings that PHMSA published in the Federal Register on April 24, 2026. If any adverse comment is received to a DFR PHMSA must rescind the rule and repropose. Click here to access the documents.

Rulemaking Description Stage Code
Pipeline Safety and Hazardous Materials Safety: Amendments to PHMSA Procedural Regulations PHMSA proposed miscellaneous amendments to procedural regulations governing informal rulemaking for both pipeline safety and hazardous materials programs. NPRM 49 CFR Part 190
Pipeline Safety: Interpretation Request Procedures PHMSA amended interpretation procedures to require publication of interpretation requests on its website and provide an opportunity for public comment. Final Rule 49 CFR Part 190
Pipeline Safety: Declaratory Order Procedures PHMSA established formal procedures for issuing declaratory orders through a new section in Part 190. Final Rule 49 CFR Part 190
Pipeline Safety: Consent Orders PHMSA clarified that consent agreements may be used to resolve enforcement actions, including cases involving civil penalties. Final Rule 49 CFR Part 190
Pipeline Safety: Adjustment to OPID Notifications for Construction PHMSA proposed adjusting the inflation-based threshold that triggers OPID notifications for certain construction and facility modification activities. NPRM 49 CFR Part 191
Pipeline Safety: Eliminating Limitations on Welders and Welding Operators PHMSA proposed allowing welders qualified through non-destructive testing methods to perform compressor station welding activities currently subject to additional restrictions. NPRM 49 CFR Part 192
Pipeline Safety: Material Properties Verification During MAOP Reconfirmation PHMSA proposed clarifying that material testing at pressure test manifold sites is not required when traceable, verifiable, and complete material records already exist. NPRM 49 CFR Part 192
Pipeline Safety: Electronic Retention of Part 194 Response Plans PHMSA amended regulations to allow operators to maintain electronic copies of response plans instead of paper copies. DFR 49 CFR Part 194
Pipeline Safety: Remote Monitoring of Rectifiers PHMSA proposed allowing remote monitoring technologies for rectifiers used in external corrosion control programs. NPRM 49 CFR Part 195
Pipeline Safety: Clarifying Hazardous Liquid High-Consequence Area Designations PHMSA amended HCA guidance to clarify spill considerations in agricultural fields and reorganize threat identification guidance. DFR 49 CFR Part 195
Pipeline Safety: Timeframe to Make Rupture-Mitigation Valves Operational PHMSA proposed extending the deadline for placing rupture-mitigation valves into operation from 14 days to 90 days after a pipeline enters service. NPRM 49 CFR Part 192
Pipeline Safety: Hazardous Liquid Valve Maintenance Schedule PHMSA proposed allowing operators to implement risk-based valve maintenance schedules, subject to a maximum inspection interval of one year. NPRM 49 CFR Part 195
Pipeline Safety: Property Damage Definition for Incident Reporting PHMSA proposes revising property damage thresholds for reportable gas and hazardous liquid pipeline incidents and clarifying applicability to telephonic notifications. NPRM 49 CFR Parts 192 & 195
Pipeline Safety: Remote Sensing Technologies for ROW Patrols PHMSA proposes clarifying that unmanned aerial systems, satellites, and other remote-sensing technologies may be used to satisfy right-of-way patrol requirements. NPRM 49 CFR Parts 192 & 195
Pipeline Safety: Adjust Annual Report and NPMS Filing Timelines PHMSA proposes extending annual report and NPMS submission deadlines for gas pipeline and storage operators to June 15 each year. NPRM 49 CFR Part 191
Pipeline Safety: Editorial Corrections and Clarifications PHMSA issued multiple final rules correcting editorial errors, updating references, removing obsolete submission methods, and improving regulatory clarity. Final Rules Various
Pipeline Safety: Update of Standards Incorporated by Reference PHMSA issued multiple direct final rules updating incorporated industry consensus standards, including NFPA, ASTM, MSS, NACE, and ASME standards. Multiple DFRs 49 CFR Parts 192 & 195

Have questions about an upcoming deadline? Please reach out to Jessica Foley for assistance!

Last Updated: October 2026

Conference News

Jan252027

Pipeline Pigging and Integrity Management Conference

▦ January 25, 2027 – January 28, 2027⌖ George R. Brown Convention Center, Houston, TX

The 39th International Pipeline Pigging & Integrity Management Conference (PPIM) will take place at the George R. Brown Convention Center in Houston. The event brings together pipeline operators, engineers, and industry professionals to explore advancements in pipeline inspection, integrity management, risk assessment, and emerging technologies.…

ExhibitingBooth 524
RCP Team Attending
Heather RoarkHeather RoarkSales & Marketing Coordinator
Jessica FoleyJessica FoleyVice President
Featured Presentations
Chris McLaren
Chris McLarenExecutive Consultant
October 27, 2026 at 7:30 AM
Event Details
Last Updated: October 2026

PSI Training Schedule

Date Training Course Price Registration
Nov 17 – Nov 19, 2026 DOT Pipeline Compliance Workshop $2,150 SOLD OUT
Feb 16 – Feb 18, 2027 Pipeline Safety Audit Training $2,150 Register →
Feb 23 – Feb 25, 2027 Advanced Pipeline Risk Assessment Workshop $2,150 Register →
Mar 23 – Mar 25, 2027 DOT Pipeline Compliance Workshop $2,150 Register →

WEBINAR RECORDING!
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition

RCP and the Pipeline Safety Institute offered a free webinar exploring the 2nd Editions of API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!

WEBINAR RECORDING
Pipeline Safety: Unpacking the Class Location Change Requirements

Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!

You asked and we listened!

Advanced DOT Pipeline Compliance Workshop is on the calendar!

This intensive and interactive 3-day, in-person workshop is designed for those who have previously completed our DOT Pipeline Compliance Workshop and are ready to take their knowledge to the next level.

New Workshop Alert!

Prepare Your Team for Pipeline Safety Audits with Confidence!

Our 3-day Pipeline Safety Audit Workshop is tailored for professionals responsible for the safe operation of hazardous liquid and natural gas pipelines. Designed for groups of 10-15 participants, this interactive training…

On-Site Training Request

We have conducted on-site training for oil and gas companies for over 25 years and can provide customized workshops for companies with groups of five or more.

We would welcome the opportunity to discuss our services with you.

Sincerely,

W. R. (Bill) Byrd, PE
President
RCP Inc.