Adoption of Consensus Standards for Breakout Tanks
The February 1, 2000 Federal Register contained a correcting amendment to a final rule published April 2, 1999. The final rule incorporates by reference consensus standards for aboveground steel storage tanks into the hazardous liquid pipeline safety regulations. This document makes two minor corrections to the final rule. First, it adds an industry publication, American Petroleum Institute (API) 1130 to the list of incorporated references. Second, it corrects the reference to the API Standard 653 to include Addendum 2. The Federal Register publication can be found on the RCP Web-site at
http://www.your-rcp.com/downloads/Misc/65 FR 4770 2-1-00.pdf
(requires Adobe Acrobat to view)
Is all of your Tier II information getting you down? Too many things to do, and not enough time to become an expert on this too? RCP can prepare your Tier II reports and handle the electronic submittals for you. Give Tina a call at 225-755-7760.
Oil Spill Worse Case Discharge
RCP is currently working to develop more precise methods to estimate the worst case discharge (WCD) for long oil pipelines. The default method is to assume the entire volume of oil in the pipeline between block valves is lost during a worst case discharge spill. However, numerous factors can have a significant impact on the volume of oil that could actually leak from a damaged pipeline – including pipeline diameter, pipe elevation profile, oil compressibility, and pipeline wall thickness versus operating pressure. If you would like to participate in development of this WCD calculation methodology, please contact Bill Byrd at wrbyrd@your-rcp.com.
Operator Qualification
Once again this month, we will evaluate a task with the 4-part test as required by the Operator Qualification Rule. As we have discussed in previous issues, it is not always an easy decision when deciding whether or not a task is covered.
Is placing and maintaining line markers a covered task?
- Is it performed on a pipeline facility? The definition of a pipeline facility includes the pipeline right-of-way. Since these markers are placed in the right-of-way, this task is indeed performed on a pipeline facility.
- Is it an Operations and Maintenance task? This task is required under Subpart F of 49 CFR Part 195 Operations and Maintenance.
- Is it performed as a requirement of 49 CFR Part 192 or 195? This task is performed to comply with 49 CFR Part 195.410 (a) & (c)
- Does it affect the operation or integrity of the pipeline? Although the actual placement and maintenance of the markers themselves does not affect the operation or integrity of the pipeline, without the markers the pipeline integrity of the pipeline is in danger from third parties.
What do you think about these questions? Please email your comments on this or other tasks that you would like to have included in future newsletters to tdhollowell@your-rcp.com
National Pipeline Mapping System
The U.S. DOT Office of Pipeline Safety (OPS) administers the national regulatory program to assure the safe and environmentally sound transportation of natural gas, liquefied natural gas and hazardous liquids by pipeline. The Accountable Pipeline Safety and Partnership Act of 1996 requires that OPS adopt rules requiring interstate gas pipeline operators to provide maps of their facilities to the governing body of each municipality in which the pipeline is located. OPS is also required to adopt rules requiring pipeline operators to identify facilities located in unusually sensitive areas and high density population areas, to maintain maps and records detailing that information, and to provide maps to federal and state officials upon request. A joint government-industry pipeline mapping quality team (MQAT I) developed a set of strategies concerning how the OPS could develop reasonable pipeline location information without creating an undue burden on the pipeline industry. The findings of MQAT I are described in, "Strategies for Creating a National Pipeline Mapping System". The second joint Government/Industry Pipeline Mapping Quality Action Team (MQATII) developed standards for the states and the national repository as well as Pipeline and Liquefied Natural Gas Operator Submission standards. MQATII drafted these standards and incorporated appropriate recommendations outside those developed by the action team. Check out the National Pipeline Mapping System at http://www.npms.rspa.dot.gov/default.htm.
Pending Audits? Has the DOT notified you of a pending audit? RCP can provide confidential internal auditing to help ensure that your facilities are up to the agency's latest standards.
Slotted Guidepoles on Tanks
On January 14, 2000, the EPA gave express notice of a regulatory interpretation that "slotted guidepoles at certain petroleum storage vessels and tanks may not comply with regulatory requirements. Slotted guidepoles are relatively simple devices for sampling the contents of a floating roof storage tank. Unless they are controlled, the slots, hollow core and the space between the guidepole and the tank's roof are observable emission pathways that violate the "no visible gap" prohibition in 40 CFR part 60, subparts Ka and Kb.
Based on these determinations, EPA Region IX brought enforcement actions against 5 California refineries that had tanks with slotted guidepoles and later issued a letter to the Western States Petroleum Association in which it provided a detailed analysis of the issue, determining that slotted guidepoles are subject to the no visible gap requirement. These enforcement matters were settled by the facilities installing controls (e.g., floats and wipers) at 20 NSPS Subpart Ka/Kb tanks and 27 non-NSPS tanks.
Also on January 14, 2000, the EPA proposed a "Storage Tank Emission Reduction Partnership Program". In the interests of promoting fast, efficient and widespread emission reductions, EPA intends to offer and enter into agreements with companies that installed or will install controls to reduce slotted guidepole emissions at their NSPS Subpart Ka/Kb tanks. As under EPA's policy concerning voluntary disclosure, this opportunity will be available only to owners/operators of affected NSPS Subpart Ka/Kb facilities that are not currently the subject of an enforcement action based upon their use of slotted guidepoles.
Damage Prevention Meeting:
RSPA will hold a public meeting on Thursday, February 17, 2000, from 9:00 a.m. to 4:30 p.m to continue the efforts to prevent damage to underground facilities, as identified in last year's Common Ground Study. RSPA is facilitating the establishment of an organization to advance underground facility damage prevention. RSPA has established four teams: by-laws, finance, membership, and nominating. The purpose of this meeting is to provide a forum for these teams and interested public to begin the development of this damage prevention organization. ADDRESSES: The public meeting will be held at the Sheraton International Hotel at BWI, 7032 Elm Road BWI Airport, MD. FOR FURTHER INFORMATION CONTACT: Eben M. Wyman, (202) 366-0918, or by e-mail at eben.wyman@rspa.dot.gov.
Need to permit a new facility? RCP's expert staff can handle the entire permitting process. We have decades of experience with all types of permitting and authorizations, and have professional engineering registrations throughout the Gulf Coast.
Tier Two Inventory Reports:
The Louisiana State Police has unveiled a new electronic reporting format for the annual Tier Two inventory report submittal. The system can be accessed via internet access with no additional software requirements at http://www.pds.state.la.us/lanweb.nsf. Facility and user ID numbers and passwords can be requested at the above site. The Id and password will be sent to you by the "Right-to-Know" Unit of the Louisiana State Police via US mail for you to begin the filing process. The electronic filing is not required, but the State Police and the EPA state that they will not take enforcement action against facilities planning to submit the information electronically for filing after March 1, 2000. However, the complete inventory information must be available upon request by March 1, 2000 and must to submitted by May 1, 2000. This extension only applies to facilities filing ELECTRONICALLY. Please note however, that the EPA does not have authority to extend the deadline. Their promise is only to not take enforcement action. If challenged by some group, it is not clear what the EPA would do.
Some points to remember about the electronic data submittal:
- Electronic submittal of the data through the new system satisfies the state police reporting requirement. No hardcopy must be sent if the form is electronically submitted.
- Only one person per facility will be authorized to submit the final “certified” form. No signature is required for electronic submittals.
- Hardcopies must still be sent to the LEPC and fire department. The program will print a suitable document for submittal.
- The program creates a form for assessing the fee associated with the submittal. This must be printed out and mailed with a check to the State Police. The system will eventually allow for credit card payments.
- Data can be entered into the system at any time. It can also be edited at any time. The “official” report only occurs when the person authorized to submit the data actually does so.
- Data access will be limited to the following groups for each facility: Company representatives Consultants (is authorized by the company) State Police Parish LEPC Neighboring LEPC if facility is within one mile of parish boundary Local fire departments
Related information can be found at:
Upcoming Seminars:
RCP is planning DOT seminars in May and October of 2000 in Houston, Texas. These seminars will include an "Introduction to the DOT Pipeline Regulations" seminar in May, and in October we will have a seminar specifically concerning DOT Pipeline Operator Qualification issues. Watch this newsletter or check our website for details.
Help Wanted:
Know someone with regulatory expertise who is interested in full or part time work? Our recruiting coordinator would be glad to get their resume! Have them sent to linda@your-rcp.com, or FAX to 713-655-8083.
Visit Regulatory Compliance Partners on the Web at
or give us a call at 1-888-RCP-X-YES to see what we can do for you.
These articles are maintained and updated as new information becomes available.
Regulatory Watch: Key Dates & Deadlines
Welcome to Regulatory Watch! In this monthly update, we’ll keep you informed on proposed rule comment periods, effective dates, and upcoming deadlines for various compliance requirements.
Administrative Rulemaking Regulatory Procedures
All Liquid HCA segments capable of ILI § 195.452(n)
Amendments to Liquefied Natural Gas Facilities
Breakout Tank
Coastal Ecological Unusually Sensitive Areas
Cost Recovery for Siting Reviews for LNG Facilities
Gas Pipeline Leak Detection and Repair
Gas Transmission: Assessments Outside HCAs § 192.710
Oil Spill Response Plans, Accident Notifications, Inspections and Investigations and other Miscellaneous Pipeline Safety Changes
Pipeline Operational Status
Repair Criteria for Gas and Hazardous Liquid Pipelines
Safety of Carbon Dioxide and Hazardous Liquid Pipelines
Safety of Gas Distribution Pipelines and Other Pipeline Safety Initiatives
Sprint I & II Update
To further the Administration’s deregulatory policies, PHMSA has published in today’s Federal Register twenty-eight (28) separate rulemaking actions affecting the pipeline safety regulations (PSR; Parts 190-199). Click here to access the documents.
| Rulemaking | Description | Stage | Code |
|---|---|---|---|
| Pipeline Safety: Rationalize Special Permit Conditions | PHMSA proposes to amend its special permit procedures to ensure permit conditions are directly tied to the specific pipeline safety regulations being waived. | NPRM | 49 CFR Part 190 |
| Pipeline Safety: Rationalize Calculation of Regulatory Filing and Compliance Deadlines | PHMSA will clarify that regulatory filing and compliance deadlines falling on weekends or Federal holidays automatically move to the next business day. | DFR | 49 CFR Part 190 |
| Pipeline Safety: Adjust Annual Report Filing Timelines | PHMSA will amend annual reporting requirements to move the gas pipeline annual report submission deadline from March to June. | DFR | 49 CFR Part 191 |
| Pipeline Safety: Property Damage Definition for Incident Reporting | PHMSA will clarify incident reporting property damage calculations for gas pipelines and update hazardous liquid accident reporting thresholds using inflation-adjusted criteria. | DFR | 49 CFR Parts 191 & 195 |
| Pipeline Safety: Exception for In-Plant Piping Systems | PHMSA proposes to clarify that in-plant piping systems are not subject to federal pipeline safety regulations. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Codify Enforcement Discretion on Incidental Gathering Lines | PHMSA proposes to codify enforcement discretion clarifying that restrictions on the historical incidental gathering line exemption apply only to newly constructed lines. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Eliminate Burdensome Coating Assessment Deadlines | PHMSA proposes to replace prescriptive deadlines for coating damage assessments and remediation with a requirement that activities be completed before the pipeline is placed in service. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Atmospheric Corrosion Reassessment for Pipeline Replacements | PHMSA proposes to remove the 3-year reassessment interval following replacement of atmospheric corrosion defects and allow use of the standard 5-year reassessment interval. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Harmonize Class Change Pressure Test Requirements | PHMSA proposes to reduce the minimum pressure test duration following certain class location changes from 8 hours to 4 hours, aligning with existing Subpart J requirements. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Clarify MAOP Reconfirmation Testing Records | PHMSA will issue a technical correction clarifying that operators may use pre-1970s pressure test records when reconfirming MAOP under §192.624. | Final Rule | 49 CFR Part 192 |
| Pipeline Safety: Remote Sensing Technologies for ROW Patrols | PHMSA will explicitly allow right-of-way patrols to be conducted using unmanned aircraft systems, satellites, and other remote sensing technologies. | DFR | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Technical Standards Updates and Amendments | PHMSA will update incorporated standards and make technical amendments in response to an industry petition for reconsideration. | Final Rule | 49 CFR Part 192 |
| Pipeline Safety Program: Update of Standards Incorporated by Reference | PHMSA issued multiple direct final rules updating incorporated industry consensus standards used throughout Parts 192 and 195, replacing outdated editions with current versions. | Multiple DFRs | 49 CFR Parts 192 & 195 |
The following is a summary of the 40 rulemakings that PHMSA published in the Federal Register on April 24, 2026. If any adverse comment is received to a DFR PHMSA must rescind the rule and repropose. Click here to access the documents.
| Rulemaking | Description | Stage | Code |
|---|---|---|---|
| Pipeline Safety and Hazardous Materials Safety: Amendments to PHMSA Procedural Regulations | PHMSA proposed miscellaneous amendments to procedural regulations governing informal rulemaking for both pipeline safety and hazardous materials programs. | NPRM | 49 CFR Part 190 |
| Pipeline Safety: Interpretation Request Procedures | PHMSA amended interpretation procedures to require publication of interpretation requests on its website and provide an opportunity for public comment. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Declaratory Order Procedures | PHMSA established formal procedures for issuing declaratory orders through a new section in Part 190. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Consent Orders | PHMSA clarified that consent agreements may be used to resolve enforcement actions, including cases involving civil penalties. | Final Rule | 49 CFR Part 190 |
| Pipeline Safety: Adjustment to OPID Notifications for Construction | PHMSA proposed adjusting the inflation-based threshold that triggers OPID notifications for certain construction and facility modification activities. | NPRM | 49 CFR Part 191 |
| Pipeline Safety: Eliminating Limitations on Welders and Welding Operators | PHMSA proposed allowing welders qualified through non-destructive testing methods to perform compressor station welding activities currently subject to additional restrictions. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Material Properties Verification During MAOP Reconfirmation | PHMSA proposed clarifying that material testing at pressure test manifold sites is not required when traceable, verifiable, and complete material records already exist. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Electronic Retention of Part 194 Response Plans | PHMSA amended regulations to allow operators to maintain electronic copies of response plans instead of paper copies. | DFR | 49 CFR Part 194 |
| Pipeline Safety: Remote Monitoring of Rectifiers | PHMSA proposed allowing remote monitoring technologies for rectifiers used in external corrosion control programs. | NPRM | 49 CFR Part 195 |
| Pipeline Safety: Clarifying Hazardous Liquid High-Consequence Area Designations | PHMSA amended HCA guidance to clarify spill considerations in agricultural fields and reorganize threat identification guidance. | DFR | 49 CFR Part 195 |
| Pipeline Safety: Timeframe to Make Rupture-Mitigation Valves Operational | PHMSA proposed extending the deadline for placing rupture-mitigation valves into operation from 14 days to 90 days after a pipeline enters service. | NPRM | 49 CFR Part 192 |
| Pipeline Safety: Hazardous Liquid Valve Maintenance Schedule | PHMSA proposed allowing operators to implement risk-based valve maintenance schedules, subject to a maximum inspection interval of one year. | NPRM | 49 CFR Part 195 |
| Pipeline Safety: Property Damage Definition for Incident Reporting | PHMSA proposes revising property damage thresholds for reportable gas and hazardous liquid pipeline incidents and clarifying applicability to telephonic notifications. | NPRM | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Remote Sensing Technologies for ROW Patrols | PHMSA proposes clarifying that unmanned aerial systems, satellites, and other remote-sensing technologies may be used to satisfy right-of-way patrol requirements. | NPRM | 49 CFR Parts 192 & 195 |
| Pipeline Safety: Adjust Annual Report and NPMS Filing Timelines | PHMSA proposes extending annual report and NPMS submission deadlines for gas pipeline and storage operators to June 15 each year. | NPRM | 49 CFR Part 191 |
| Pipeline Safety: Editorial Corrections and Clarifications | PHMSA issued multiple final rules correcting editorial errors, updating references, removing obsolete submission methods, and improving regulatory clarity. | Final Rules | Various |
| Pipeline Safety: Update of Standards Incorporated by Reference | PHMSA issued multiple direct final rules updating incorporated industry consensus standards, including NFPA, ASTM, MSS, NACE, and ASME standards. | Multiple DFRs | 49 CFR Parts 192 & 195 |
Have questions about an upcoming deadline? Please reach out to Jessica Foley for assistance!
Regulatory Watch
RCP Regulatory Rulemaking Report | Updated October 17, 2026
This report reflects published Regulatory Watch records maintained by RCP. Dates and references are displayed only where entered.
Proposed (7)
| Rulemaking | Reference | Milestones |
|---|---|---|
| Administrative Rulemaking Regulatory ProceduresProposed |
RIN: 2137-AF63
Federal Register: PHMSA-2026-1555
|
No dates recorded |
| Amendments to Liquefied Natural Gas FacilitiesProposed |
RIN: 2137-AF45
Federal Register: PHMSA-2019-0091
|
No dates recorded |
| Breakout TankProposed |
RIN: 2137-AG22
Federal Register: PHMSA-2025-1271
|
No dates recorded |
| Oil Spill Response Plans, Accident Notifications, Inspections and Investigations and other Miscellaneous Pipeline Safety ChangesProposed |
RIN: 2137-AF37
Federal Register: PHMSA-2018-0047
|
No dates recorded |
| Pipeline Operational StatusProposed |
RIN: 2137-AF52
Federal Register: NA
|
No dates recorded |
| Repair Criteria for Gas and Hazardous Liquid PipelinesProposed |
RIN: 2137-AF44
Federal Register: PHMSA-2025-0019
|
Comments close: Sep 8, 2026 |
| Safety of Carbon Dioxide and Hazardous Liquid PipelinesProposed |
RIN: 2137-AF60
Federal Register: NA
|
No dates recorded |
Final (4)
| Rulemaking | Reference | Milestones |
|---|---|---|
| Coastal Ecological Unusually Sensitive AreasFinal |
RIN: 2137-AF31
Federal Register: PHMSA-2017-0152, Amdt. No. 195-104
|
No dates recorded |
| Cost Recovery for Siting Reviews for LNG FacilitiesFinal |
RIN: 2137-AF61
Federal Register: PHMSA-2022-0118
|
No dates recorded |
| Gas Pipeline Leak Detection and RepairFinal |
RIN: 2137-AF51
Federal Register: PHMSA-2021-0039
|
No dates recorded |
| Safety of Gas Distribution Pipelines and Other Pipeline Safety InitiativesFinal |
RIN: 2137-AF53
Federal Register: PHMSA-2021-0046
|
No dates recorded |
Implementation (2)
| Rulemaking | Reference | Milestones |
|---|---|---|
| All Liquid HCA segments capable of ILI § 195.452(n)Implementation |
RIN: Not available
Federal Register: Not available
|
Effective / implementation date: Jul 2, 2040 |
| Gas Transmission: Assessments Outside HCAs § 192.710Implementation |
RIN: Not available
Federal Register: Not available
|
Comments close: Sep 8, 2026 Effective / implementation date: Jul 3, 2034 |
Conference News
Pipeline Pigging and Integrity Management Conference
The 39th International Pipeline Pigging & Integrity Management Conference (PPIM) will take place at the George R. Brown Convention Center in Houston. The event brings together pipeline operators, engineers, and industry professionals to explore advancements in pipeline inspection, integrity management, risk assessment, and emerging technologies.…
RCP Team Attending
Heather RoarkSales & Marketing Coordinator
Jessica FoleyVice President🎤 Featured Presentations
Topic to be determined

PSI Training Schedule

| Date | Training Course | Price | Registration |
|---|---|---|---|
| Nov 17 – Nov 19, 2026 | DOT Pipeline Compliance Workshop | $2,150 | SOLD OUT |
| Feb 16 – Feb 18, 2027 | Pipeline Safety Audit Training | $2,150 | Register → |
| Feb 23 – Feb 25, 2027 | Advanced Pipeline Risk Assessment Workshop | $2,150 | Register → |
| Mar 23 – Mar 25, 2027 | DOT Pipeline Compliance Workshop | $2,150 | Register → |
WEBINAR RECORDING!
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
Unpacking the Key Updates in API RP 1170 & 1171, 2nd Edition
RCP and the Pipeline Safety Institute offered a free webinar exploring the 2nd Editions of API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. Thank you to everyone who attended and participated in this informative webinar. The session recording is posted to our YouTube channel. Please watch, like, and subscribe to our channel!
You asked and we listened!
Advanced DOT Pipeline Compliance Workshop is on the calendar!
This intensive and interactive 3-day, in-person workshop is designed for those who have previously completed our DOT Pipeline Compliance Workshop and are ready to take their knowledge to the next level.
New Workshop Alert!
Prepare Your Team for Pipeline Safety Audits with Confidence!
Our 3-day Pipeline Safety Audit Workshop is tailored for professionals responsible for the safe operation of hazardous liquid and natural gas pipelines. Designed for groups of 10-15 participants, this interactive training…
On-Site Training Request
We have conducted on-site training for oil and gas companies for over 25 years and can provide customized workshops for companies with groups of five or more.
We would welcome the opportunity to discuss our services with you.
Sincerely,
![]()
W. R. (Bill) Byrd, PE
President
RCP Inc.![]()
- Adoption of Consensus Standards for Breakout Tanks
- Oil Spill Worse Case Discharge
- Operator Qualification
- National Pipeline Mapping System
- Slotted Guidepoles on Tanks
- Damage Prevention Meeting:
- Tier Two Inventory Reports:
- Help Wanted:
- Regulatory Watch: Key Dates & Deadlines
- Conference News
- PSI Training Schedule